Here is a question:

Loren Littlejohn

Lover of all boobage.
Ok here is the senario:

1: You have only 24 hours you can commit to this project a week (period).
2: It takes them 7 hours per song to track (including reamping later)
3: They want to do 9 songs.
4: You have to setup and tear down your stuff in between mixing and tracking each song.

How long would you tell them the project will take to compliete?

Basically if I rush I can mix a song in 3-4 hours (drums take me a long ass time).