Pellaz
Tigron of Immanion
When I stayed at the Courtyard Techwood, the manager on duty said that the goal was to have the bridge rebuilt by June 2009 (though I've seen on the web October 2009).
June seems awfully optimistic. I'd be inclined to bet on October.
I wonder if the 14th street bridge will be something like the 17th street bridge, where the travel lanes and sidewalks are wide?
All the recently-built spans across the Downtown Connector have been designed that way, so I'm hoping they'll do the same with 14th St.