So, this is what I got back today;
We have 30 minutes, not 45 like we were originally told. Which, btw, makes no fucking sense becasue we had 45 minutes to play when there was 17 bands, now there is 11 bands and out set gets cut?
There will be no equipment provided except for the PA.
The "professional sound guy" will "have the ability to mic the amps and drum kit, as well as work the PA. Well pin a rose on his fucking nose, isn't that a sound guys job?
And still NO FUCKING WORD on time slots.
30 minutes for us means 4 songs. It's ashame we spent money on this or I would just say fuck it and we could all go to the beach instead.
If and when I get word on the time slot, I'll let ya'll know, but I am just going to assume that BR was right and it's "between 2 and 4." It's like waiting around for the fucking cable guy.