Got the concrete poured today....
so, planning ahead into wiring electrical. Do I need to have lots of circuits per number of outlets?
For instance, only two or three 110 outlets per circuit breaker in the box?
And should the DAW and Firewire interface be on a separate circuit than everything else in the building?
Any other wiring tips are appreciated. I'd rather get it right the first time, than have a bunch of ground looping, noise, or blown breakers.
so, planning ahead into wiring electrical. Do I need to have lots of circuits per number of outlets?
For instance, only two or three 110 outlets per circuit breaker in the box?
And should the DAW and Firewire interface be on a separate circuit than everything else in the building?
Any other wiring tips are appreciated. I'd rather get it right the first time, than have a bunch of ground looping, noise, or blown breakers.