We are going to built our own studio!!!

More Pics!!!!:headbang:
file.php

file.php

file.php

file.php

file.php

file.php
 
so here is another update.
a lot has bin going on. we finished the heracliet (still don't know the english therm) and we now moved on to plasterboard. things are going wel. we also started to make some silincers to go in the wall of the live room for ventilation.

I would like to post some pics but can someone tell me how I can post pics directly in to the treath. so people can see them imediatly and don't have to visit a syberlink.
as soon as I know I will post some more pics:Smokin::Smokin:
 
Cool thread, upload the pictures onto imageshack (http://www.imageshack.us/)

Once the file has uploaded it will give you a direct link to the image. Copy that direct link.

When creating a new message on this forum use the "insert image" button. Paste the direct image link from imageshack into the box.

The image should load up instantly within the thread.

Keep the pictures coming!
 
Thanks for the advice men:kickass:
So here we go as promised pics:headbang:
dsc00462i.th.jpg
[/URL][/IMG]
dsc00523lm.th.jpg
[/URL][/IMG]
dsc00526w.th.jpg
[/URL][/IMG]
dsc00536c.th.jpg
[/URL][/IMG]
dsc00455n.th.jpg
[/URL][/IMG]
dsc00532e.th.jpg
[/URL][/IMG]
dsc00547o.th.jpg
[/URL][/IMG]
dsc00540.th.jpg
[/URL][/IMG]
dsc00534a.th.jpg
[/URL][/IMG]
Hope it worked :loco:
 
time for a litlle update.
al the plasterboard is almost in and also the kitchen is getting shape.
we also placed one of the two silincers.
dsc00583.th.jpg
[/URL][/IMG]
dsc00581iy.th.jpg
[/URL][/IMG]
dsc00580a.th.jpg
[/URL][/IMG]
dsc00556i.th.jpg
[/URL][/IMG]
dsc00566l.th.jpg
[/URL][/IMG]
dsc00565n.th.jpg
[/URL][/IMG]
 
Time for another update.
The plasterboard is done and all the walls have bin treated with stucco/plaster to smooth them out.
The tiles in the kitchen are done, and the toilet is nearly done.
We also costructed a closet next to the kitchen for extra storage.
Next up are the speaker walls in the controle room and after that the wallpaper can go on the walls.
But first things first, here are the pictures :headbang:
dsc00621os.th.jpg
[/URL][/IMG]
dsc00620e.th.jpg
[/URL][/IMG]
dsc00618j.th.jpg
[/URL][/IMG]
dsc00607f.th.jpg
[/URL][/IMG]
dsc00596td.th.jpg
[/URL][/IMG]
dsc00595p.th.jpg
[/URL][/IMG]
 
As promised, the speaker walls are done.
we are currently busy with cleaning everything up zo we can move on to paint and wallpaper. The construction is done :headbang:zo no more plasterboard and iso for a while! As I said we are cleaning everything up and are just done with abrading the walls zo the piant and wall paper can go on.
We've still got a lot to do but we are getting there!!!
dsc00636z.th.jpg
[/URL][/IMG]
dsc00633k.th.jpg
[/URL][/IMG]
dsc00644d.th.jpg
[/URL][/IMG]
dsc00646b.th.jpg
[/URL][/IMG]
dsc00651wz.th.jpg
[/URL][/IMG]
dsc00661ne.th.jpg
[/URL][/IMG]
 
Yes New Pics:headbang:
So allot is bin getting done lately.
we constructed window and door frames incuding the frame for the window between the live and contrale room.
We also painted all the frame work. Next to that we are done with all the wall paper:kickass:. Also the toilet is mounted and we paited the closet to. And more and more electric is done. Now all that we have to do is paint the wallpaper and than its on to the floors!!!!
dsc00697.th.jpg
[/URL][/IMG]
dsc00696b.th.jpg
[/URL][/IMG]
dsc00694o.th.jpg
[/URL][/IMG]
dsc00681k.th.jpg
[/URL][/IMG]
dsc00680i.th.jpg
[/URL][/IMG]
dsc00673g.th.jpg
[/URL][/IMG]
 
So here we are again.
Its bin 2 weeks, a little sickness and a lot of work getting done!!!
You can now start to see everything come together.

-Painting of the walls is done
-Ceiling is done
-Laminate floor is done
-Electrics is almost done
-Lighting is done
-Glass for the controle/live room arrived

We also started building acoustic pannels and diffusors.
And we started the framework for the basstrap in the controle room.

We are slowly getting their but there is still a lot to do.
But for now Pictures!!!!!! :yow:

dsc00722m.th.jpg
[/URL][/IMG]
dsc00718ty.th.jpg
[/URL][/IMG]
dsc00731t.th.jpg
[/URL][/IMG]
dsc00736o.th.jpg
[/URL][/IMG]
dsc00742mk.th.jpg
[/URL][/IMG]
dsc00745h.th.jpg
[/URL][/IMG]
dsc00747a.th.jpg
[/URL][/IMG]
dsc00748w.th.jpg
[/URL][/IMG]
 
LOOKING GOOD!!
nice diffusers! did you build or buy them?? if you built them, could you link me to a plan?? hell link me either way!!
 
LOOKING GOOD!!
nice diffusers! did you build or buy them?? if you built them, could you link me to a plan?? hell link me either way!!

We've built them our selfs.
A lot of sawwing and grinding involved:devil:
But we are really pleased with the result.

Here are some links:

http://www.gearslutz.com/board/bass...1-i-just-built-my-first-skyline-diffuser.html

http://www.gearslutz.com/board/bass-traps-acoustic-panels-foam-etc/369164-diy-diffusors-max.html

http://www.gearslutz.com/board/bass...w-qrd-calculator-available-called-qrdude.html

this is the calculater we used to calculate the diffussers:
http://www.subwoofer-builder.com/qrdude.htm

their called, quadratic residue diffussor. Better know as skyline diffussor.
just google the terms and you can find many things about them.
Their not difficult to make just a bit time consuming:D

WD
 
So its bin a while since the last update.
We've bin busy as hell!!! So thats why it took so long for this update to come.
A lot is bin getting done and the prognose is that the studio will be done around christmas :headbang::headbang::headbang::headbang:!!!!!!

-Airco's are done
-Doors are in
-All acoustic panels are up
-The multicore is connected
-Speakers are in the wall
-Allot of the equipment is already in
-Internet is connected
-Drumstage is constructed
-Mobile difussers/absorbers are done
-Window between live and controle room is in
-Sillincer in the garage is done
and so on

We're currently working on the basstrap in the control room.
But first things first pictures!!!!!!!

dsc00779a.th.jpg
[/URL][/IMG]
dsc00792v.th.jpg
[/URL][/IMG]
dsc00793yr.th.jpg
[/URL][/IMG]
p1010781n.th.jpg
[/URL][/IMG]
p1010776.th.jpg
[/URL][/IMG]
p1010771.th.jpg
[/URL][/IMG]
p1010767p.th.jpg
[/URL][/IMG]
p1010782s.th.jpg
[/URL][/IMG]
p1010775c.th.jpg
[/URL][/IMG]
p1010772lk.th.jpg
[/URL][/IMG]
 
Nice.
It would probably be better if you reposition the alesis monitors vertically.
Horizontal position is known to increase potential phase problems (between the boomer and the tweeter) and making the sweet spot smaller as a result.
 
Very awesome looking place! The only thing I will say is that the desk looks a little plain without a mixing board :loco:
 
Nice.
It would probably be better if you reposition the alesis monitors vertically.
Horizontal position is known to increase potential phase problems (between the boomer and the tweeter) and making the sweet spot smaller as a result.

We only use the alesis as back-up/double check monitors.
We will be mixing on the dynaudio's.
This set-up works best for us.
And we haven't found any phase problems so far.
Thanks for the advice anyway.

WD
 
Just a litlle update.
The basstrap/backwall in the controleroom is done.
And the closset is ready to.
Just wanted to show you.
WD
file.php

file.php

file.php

file.php

file.php

file.php

file.php

file.php