Started building my (small) studio

Thanks for watching this thread!!!

More pics of the wood floor, it's already done, the rest of the Control room will have carpet.
After the wall fabric panels and carpet are installed it will have the wood base installed all around the rooms.

As you can see the fabric panels are already being installed. :)

Control room
CR%20Wood%20Floor%2002.jpg


CR%20Wood%20Floor%2003.jpg


CR%20Wood%20Floor%2004.jpg



Recording Room
Wood%20Floor%2007.jpg


Wood%20Floor%2008.jpg
 
Simple awesome!

Eddy, I must say...Following this thread for a year has been really exciting. I can't wait to see it when it's finished and has equipment in it!

-Joe
 
All wall panels are in place

Wall%20bass%20traps%20fabric%20panels%20installed%2001.jpg


Lights are on!!!!

Panels have some dust :(

Wall%20bass%20traps%20fabric%20panels%20installed%2002.jpg


Wall%20bass%20traps%20fabric%20panels%20installed%2003.jpg


Wall%20bass%20traps%20fabric%20panels%20installed%2004.jpg


Wall%20bass%20traps%20fabric%20panels%20installed%2005.jpg


Wall%20bass%20traps%20fabric%20panels%20installed%2006.jpg



Change in plans.

I'm installing hardwood floor on the control room where it was supposed to be carpet.
There was plenty of hardwood left from the Recording room so I decided to order some more and have it installed in the control room instead of carpet, adding the fact that wood floor is easier to mantain than carpet.

So they already started installing the floor.

CR%20Wood%20Floor%20Sucupira%2001.jpg
 
Last week problem (I couldn't have a week without a problem) :Smug:

The electrical socket hole was done on the wrong place, it got the edge of the isolation box. This one was my fault, I gave the wrong measures.

Check measures twice, then make hole
Check measures twice, then make hole
Check measures twice, then make hole
Check measures twice, then make hole
Check measures twice, then make hole
Check measures twice, then make hole

Wrong%20electrical%20socket%20hole.jpg



But the good news is:

The Barefoot monitors have arrived!!!!!! :Smokin: :Smokin: :Smokin: :headbang:

Barefoot%20monitors%20boxes.jpg
 
The sucupira wood on the back of control room floor is done. There is only one little area on the front that is missing. But the wood that I had has finished, so I'm waiting for more to arrive.

The wood base is all installed all around where the floor is finished.

CR%20Wood%20Floor%2005.jpg


CR%20Wood%20Floor%2006.jpg


CR%20Wood%20Floor%2007.jpg