So, here's another thread about a studio build.
Mine is smaller, more of a project studio ( ), and the building allready exists, but it's a lot of work anyway. I'll post the progress and some pics from time to time. It's not as interesting as a big studio build, but perhaps someone likes to read my shit and look at the pics. The thing is, I will live there as well, not only work.. So it's a bit difficult to plan, especially because there is not that much room
Overview:
Liveroom:
Controlroom:
The live room is 24 squaremeters, the controlroom 11.
There's a studio designer / acoustician who helps me to design and plan everything, I'll post his proposals and plans soon.
Right now I'm in the very early stages.. The house was full of crap - a LOT of crap - and it took my a few weeks to dispose of the old furniture and so on.
Today, we took out the carpeted floor (I'm tired as fuck right now), I also ordered the new floor for both rooms so it should arrive in about 8-10 days. maple ftw.
In the meantime, I will most probably paint all the walls, perhaps buy a new kitchen, lay-up the new kitchen floor etc. There's always work to be done.
I'm so fucking excited. And I hope everything will go as planned..
Mine is smaller, more of a project studio ( ), and the building allready exists, but it's a lot of work anyway. I'll post the progress and some pics from time to time. It's not as interesting as a big studio build, but perhaps someone likes to read my shit and look at the pics. The thing is, I will live there as well, not only work.. So it's a bit difficult to plan, especially because there is not that much room
Overview:
Liveroom:
Controlroom:
The live room is 24 squaremeters, the controlroom 11.
There's a studio designer / acoustician who helps me to design and plan everything, I'll post his proposals and plans soon.
Right now I'm in the very early stages.. The house was full of crap - a LOT of crap - and it took my a few weeks to dispose of the old furniture and so on.
Today, we took out the carpeted floor (I'm tired as fuck right now), I also ordered the new floor for both rooms so it should arrive in about 8-10 days. maple ftw.
In the meantime, I will most probably paint all the walls, perhaps buy a new kitchen, lay-up the new kitchen floor etc. There's always work to be done.
I'm so fucking excited. And I hope everything will go as planned..